A.N. CREATION — SHORT DESIGN AND FAILURE REVIEW — TEMPLATE REV 1 Companion: https://ancreationoffice.com/design-risk.html Use one or two pages for a simple product; expand where needed. Blank fields are unresolved. This is not product approval or certification. PART 1 — WHAT MUST WORK, AND WHAT MUST FIT Product / intended users and use: Product, model and drawing revisions / date: Scope, interfaces, exclusions and qualified reviewers: b-project-manager drafts this review from project records and specialist input. Customer needs / requirements (repeat for each significant need): ID / customer wording / source: Agreed measurable target and use conditions (unknown if not agreed): Design feature or characteristic that addresses it: Verification method / acceptance criteria: Actual evidence and revision / status / owner: Validation with intended users / result or remaining work: Conflicting or deferred input / reason / agreed decision: Fit and manufacture: Critical interface / functional minimum and maximum clearance: Dimensions, geometric controls and datums / units: Worst-case tight and loose stack / assumptions / result: Allowance for environment, coating, movement and wear: General tolerance convention and edition / explicit exceptions: Supplier capability and inspection method / evidence: Edges, radii, walls, cores, draft, tool access and assembly sequence: Wrong-way assembly prevention / incorrect attempts to test: PART 2 — HOW IT COULD FAIL, AND WHAT WE WILL DO Copy this block for each significant failure mode: Risk ID / linked CTQ and requirement / design or process scope: Function / failure mode: Effect on user and system / severity and rationale: Possible cause / likelihood and evidence or uncertainty: Existing prevention / evidence: Existing detection / escape likelihood and evidence: Priority and rationale; serious safety effects reviewed explicitly: If formal ratings are used: defined scale, S / O / D / required method: Possible routes around or through / person or expertise that could help: Question to carry into the next relevant conversation: What can continue now / affected activity only if a limit applies: Action to prevent or reduce the problem: Owner / due date / status: Planned effectiveness test and acceptance criteria: Actual result / exact tested revision / evidence location: Remaining risk / revised assessment / reviewer and decision date: For an observed failure also record: Symptom / expected behavior / affected units / containment: Conditions where it happens and does not / recent changes: Measurement checks / hypotheses / tests / confirmed contributing causes: Corrective action / repeat and regression tests / recurrence monitoring: Linked control plan: process step, characteristic/limit and source, prevention, measurement, sampling/frequency, owner, result record and reaction plan. Unknown details remain proposed/unresolved; actual evidence is separate. Templates: critical-quality.csv and control-plan.csv beside this file. Review summary: Open safety issues and limits on the next activity: Roadblock-list links / opportunities to follow up: Next useful action that moves the project forward: Actions and dependencies to send to b-project-manager: Responsible reviewer / next review date and change triggers: Do not lower a rating or close an action without supporting evidence.