Plastic-base snap mousetrapRequest for quote · Oct 24, 2026

Page 1

Request for quote

Oct 24, 2026

To: Sales engineer, Molder A

We are developing the plastic-base snap mousetrap and are asking a small number of suppliers to quote the parts below. The drawings and CAD files are attached under a mutual NDA.

5,000 traps
First order
50,000 traps a year for 2 years
Planned volume
Oct 29, 2026
Quote needed by
2
Parts to quote

Please quote

For each part: piece price at the first-order and annual quantities, tooling cost and type, cavities, tool life, lead time for tooling and for parts, and what is included (inspection, packaging, freight).

Reply to [email protected].

Plastic-base snap mousetrapRequest for quote · Oct 24, 2026

Page 2

Parts to quote

Part no.PartWhat it isPer unitDrawing / CADMake or buy
MT-001Plastic baseNylon 6/6 base with the bait cup, finger guard and spring post molded in. Wall 1.8 mm, draft 1 degree.1 eachCAD rev X3 (STEP) and a drawing with critical featuresmake
MT-002Trigger plateNylon 6/6 pedal with the bait spike molded on. Its own small mold.1 eachCAD rev X3 (STEP)make
Plastic-base snap mousetrapRequest for quote · Oct 24, 2026

Page 3

Requirements

Critical features (from the risk analysis)

These come from the failures that could hurt someone or stop the product working. They are marked on the drawings.

Failure or featureWhy it matters
F1Base cracks at the spring seatSeverity 8
Add a short rib at the spring seatdesign feature to hold
Use an engineered resindesign feature to hold
F11A finger stays in the path of the bail while settingSeverity 9
Mold a set-from-the-side markdesign feature to hold
Mold a finger guard beside the baildesign feature to hold

Quality

Packaging of parts

Parts in bulk cartons by part number; label with part number and lot

Plastic-base snap mousetrapRequest for quote · Oct 24, 2026

Page 4

Commercial terms and timeline

Tooling ownershipThe inventor owns the molds and can move them
Payment terms asked50% of tooling at order, 50% at first-article approval; parts net 30
ConfidentialitySigned mutual NDA before CAD is sent

Timeline

ByMilestone
Apr 30, 2027First shipment to a distributor
Dec 15, 2026Design frozen (risk actions in the CAD)
Jan 15, 2027Molds ordered
Mar 15, 2027First articles approved
Nov 30, 2026Buyer feedback from 3 distributors
Oct 22, 2026Spring supplier confirmed
Oct 29, 2026Base mold quote in hand
Plastic-base snap mousetrapRequest for quote · Oct 24, 2026

Last page

Prep sheet

For the inventor only. Not handed over. Sales engineer, Molder A, Oct 24, 2026.

The goal

Get firm quotes for the base and trigger plate molds and parts, including a 2-cavity family mold option

What we ask for

Walk-away

No tooling order until the numbers close; no tool we can't move

What they will likely ask

QuestionAnswer
What volume is this really?5,000 for the first order, 50,000 a year planned for two years; we'll confirm with distributor orders.
Who pays for the tool and when?We do: half at order, half at first-article approval.
What tolerances matter?The spring seat, the bail pivot holes and the finger guard; the rest is cosmetic. They're marked on the drawing.
What resin?Nylon 6/6 for both parts; open to a suggestion if it molds better.

Comparing the quotes like for like

Line every quote up onMolder A
Piece price at first order and at annual volume
Tooling: cost, type (steel or aluminum), cavities, life in shots
Who owns the tool, and can it move
Lead time: tooling, first articles, production
What's included: inspection, packaging, freight
Payment terms

Each quote goes on the cost sheet as a quote with its date, replacing the placeholder (today's placeholder tooling: $107,000).

Still open (say so if asked)

TodayNote
Legal nameNot formed yetForming a single-owner LLC is with the Office Manager Bot (business risk B5).
EntityPlanned: single-owner LLC
Tax ID (EIN)Not yetNeeded for a W-9 and a business bank account. Free from the IRS once the LLC exists.
W-9 for vendor setupAfter the tax ID
Business bank accountNot yet
Product liability insuranceQuotes requestedBuyers often ask for a certificate of $1 million or more naming them. Illustrative.
UPC / GTIN barcodesNot yetLicense from GS1 before packaging is printed. Illustrative.
Rules that applyTo check: EPA rules for pest-control devicesA mechanical trap is a pest-control device; check EPA labeling and establishment rules before the first shipment. Illustrative.

Leave behind

This packet, minus this page.

After the meeting

Record what was said in this folder; add any signal to market-evidence.csv; update contacts.csv with the next step and date; put every promise on the action log (sop-meeting-prep.txt step 8).