Procedure: Cost sheet. Revision 7 — October 18, 2026. Index: https://ancreationoffice.com/sop.txt Kept by: b-project-manager, one per invention. May write: Office files/cost-sheet.csv. Template: https://ancreationoffice.com/template-cost-sheet.csv Goes with the spending register (https://ancreationoffice.com/sop-spending-register.txt), which records what was actually spent. One of the seven required documents (https://ancreationoffice.com/sop-project-record.txt). This sheet is the costed bill of materials, laid out the way it would go into an MRP system: every item, how many, made or bought, and what each costs in material, process and tooling. Its bottom line is the cost to manufacture one unit, with the tooling amortized over the volume. WHY THIS EXISTS A part has three kinds of money: the material in it, the process that makes it, and the tooling you pay once. Mixing the tooling into the part price hides it. Leaving it off makes the part look cheaper than it is. COLUMNS level, part number, part, qty, unit, make or buy, supplier, what it is, material cost, process cost, how the cost was figured, tooling, tooling notes, annual units, years, amortization, unit cost, running total, share of total. Level is the item's place in the bill: 1 for what goes straight into the product, 2 for what goes into a level-1 subassembly. The finished product itself is the sheet, not a row, so nothing is counted twice; a subassembly row carries only its own assembly cost, and its parts carry theirs. Part number is the inventor's own (MT-001, MT-002) until a supplier's number exists. Unit is how qty is counted: each, grams, inches, feet. Make or buy says whether it is molded or built for the project, or bought ready-made, and supplier names who makes or sells it (or "to quote"). Qty is how many of that part, in that unit, are in one product. What it is names the part so a person who was not in the room can tell it from the next row: material, rough size, and the job it does. How the cost was figured shows the arithmetic behind material cost and process cost. Tooling notes is where the tooling line splits into mold plus fixtures. Write the amounts there, such as "mold 10000 + fixtures 2000". A tool shared by more than one part is written on one row only, so it is counted once. Say on the other row that the tool is already counted. ONE ROW PER COMPONENT Every component gets a row. A product is not costed when the first part has a number and the rest are blank. Pins, latches, labels, and springs are components. A feature molded into another part, such as a spike on a pedal, does not get its own row; name it in that part's description so it is not mistaken for a missing line. Packaging is a different sheet unless the call was to cost the packed unit. HOW AMORTIZATION WORKS Amortization is the tooling spread across the units you expect to make. amortization = tooling / (annual units × years) The example row: 12000 / (5000 × 3) = 0.80 per unit. A row with no tooling has amortization of 0. If annual units or years is blank, leave amortization blank. Do not invent a volume. The unit cost on a row is material cost + process cost + amortization. Write that number in the unit cost column. The running total is that unit cost added to the running total of the row above. The last row is the cost of one unit of the product. Share of total is that row's unit cost divided by the last running total. It is the part's share of one unit, not the running total itself. The shares add to 100%. A sheet with one part is 100%. FOR THE FUNDING PACKET b-business-manager builds funding packets from a copy of this sheet (https://ancreationoffice.com/sop-funding-packet.txt). Keep it ready to copy: every component has a row, every tooling amount says whether it is a quote or a placeholder, and the quote's date and source are in tooling notes. When b-business-manager asks for it, send the current file through the office-handoff skill. Never let anyone retype it. WHEN TO UPDATE IT Worked during design and quoting, then parked once the quotes are in (https://ancreationoffice.com/sop-document-life.txt). The triggers below reopen it. Update the sheet when the design changes: a part added, removed, or changed in material, process, or tooling. Recalculate that row's amortization, every running total from that row down, and every share of total. A new quote that changes a number is updated the same way. Delete the example row before the first real entry.