Engineering change notice (ECN). Template. For a change to the charter's scope, budget or dates, or to a frozen design. Save as Office files/ecn/YYMMDD-ECN--.txt and add its row to Office files/ecn-log.csv. ECN no.: ECN- Date: What changes: (charter scope, budget or dates; part, drawing, process, supplier, tool, fixture, gauge, label) From revision: To revision: Why: (reason, and the test, report or complaint that started it) What it touches: (compliance matrix IDs, FMEA lines, critical features, control plan checks, certifications, tooling, stock on hand) What must be re-checked: (tests, inspections, qualifications; tell a lab?) Cost and time: Decision: (inventor yes/no; buyer approval if required) Done: (re-checks passed, date or batch it takes effect)