The improvement toolbox: Lean, 5S, Six Sigma and the rest. Revision 1 — October 12, 2026. Index: https://ancreationoffice.com/sop.txt Why (Mike): Lean, 5S, Six Sigma, Lean Six Sigma and the Toyota Production System borrow from each other. They are all good problem-solving tools, worth knowing, and all of them belong in the office's arsenal. The names change; the tools are tried and true. How to use it: start from the kind of problem (left), pick a tool, then open the source for the method. The one-line descriptions here are orientation only; the method lives in the sources. Projects that are data-heavy and cross departments run as Six Sigma projects (sop-six-sigma.txt). PICK THE PROGRAM BY THE PROBLEM (Mike) - Workplace is disorganized, tools can't be found, no routine: 5S (sort, set in order, shine, standardize, sustain). Usually one department, fixed by that department. - Flow is slow, waiting, extra handling, inventory piling up: Lean (value stream, waste, flow, pull). - Problem is hard to pin down, needs data, departments disagree: Six Sigma (DMAIC with statistics). - A mistake keeps happening: mistake-proofing (poka-yoke), often after root cause. - A defect on molded parts: sop-molding-defects.txt first. TOOLS BY WHAT YOU NEED TO DO Define the problem - Project charter: the problem, scope, owner, goal; agreed by everyone involved (sop-six-sigma.txt 2). - SIPOC: suppliers, inputs, process, outputs, customers on one line; sets the boundaries. - Voice of the customer and critical-to-quality (CTQ) measures: what the customer actually needs, in measurable terms. QFD links them to design (asq-qfd). - Pareto chart: which few causes or defect types make most of the losses. Map the process - Process flow chart and value stream map: every step, with time, waiting and inventory; value-adding vs not (lei-lexicon). - Spaghetti diagram: walk paths on the floor plan. Measure - Check sheet and data collection plan: what, where, how often, who. - Gauge study (gauge R&R, MSA): can the measurement be trusted (aiag-msa). - Run chart and control charts (individuals, p, and others): is the process stable, did it change (aiag-spc, nist-sematech; six_sigma.py). - Capability (Cp, Cpk): can a stable process meet the spec (six_sigma.py). Find the cause - Five whys (asq-five-whys) and root cause analysis (asq-root-cause). - Fishbone (cause and effect) diagram: people, method, machine, material, measurement, environment. - Stratification and scatter plots: split the data by press, shift, lot, season to see where it differs. - Hypothesis tests and regression: is a difference real, and how big (nist-sematech). - DOE: structured experiments; use with caution in molding (sop-scientific-molding.txt 6). - FMEA: what can fail, how bad, how likely, how detected (asq-fmea, aiag-vda-fmea). Fix it - Kaizen event: a short, focused team improvement. - SMED (quick changeover): shorten mold and material changes by moving work outside the stop. - Standard work: the one best known way, written down. - Mistake-proofing / poka-yoke (asq-mistake-proofing). - 5S for the workplace itself. Keep it fixed - Control plan (control-plan.csv; aiag-apqp), control charts on the key measure, updated process sheet and PFMEA. - Visual management and daily management (lei-lexicon). - A3 one-page summary for reporting and for the record (template-a3.txt). SOURCES (library) asq-quality-tools, asq-root-cause, asq-five-whys, asq-mistake-proofing, asq-fmea, asq-qfd, lei-lexicon (Lean Lexicon: 5S, kaizen, SMED, standard work, value stream mapping, A3, hoshin kanri), asq-ssbb-bok, nist-sematech, aiag-spc, aiag-msa, aiag-vda-fmea, aiag-apqp, lean-six-sigma-pocket-toolbook (George et al., nearly 100 tools by phase).