Product development and project terms

APQP (Advanced Product Quality Planning)

The auto industry's step-by-step way of planning a product so it comes out right: plan, design, design the process, validate, improve. This office runs every project this way behind the scenes. Read more: Quality-One — APQP overview

Stage-gate

A way of splitting a project into stages with a decision point (a gate) between them: go, hold or drop. Our stages work this way. Read more: Stage-Gate — Discovery-to-launch process

Design review

A recorded meeting where the design is checked against its requirements and a decision is made about what happens next.

Design freeze

The point where the design stops changing so tooling and formal testing can start. Changes after it go through change control.

Iteration

One more round of design, build or test. Every iteration adds time and cost, so the timeline and budget get updated.

Milestone

A dated point in the plan that marks something done, like a prototype finished or a tool approved.

Critical path

The chain of tasks that sets the earliest finish date. If one of them slips, the whole project slips.

Lead time

How long something takes from ordering to having it: a part, a tool, a lab test.

Scope creep

The project quietly growing beyond what was agreed, usually one small addition at a time.

Time, cost and quality triangle

The three are linked. Change one and hold another, and the third moves the wrong way: faster at the same quality costs more.

Requirements

The list of what the product must do and meet. Each one should be specific enough to check.

PRD (Product Requirements Document)

A written description of what the product must do, for whom, and why. Our project description plays this role. Read more: Atlassian — Product requirements template

Specification (spec)

A measurable requirement with a number and a limit: 'holds 50 lb', 'IP67', '120 x 80 mm plus or minus 0.5'.

Voice of the customer

What real users say they need, in their words. The starting point for requirements.

MVP (Minimum Viable Product)

The simplest version that still does the job well enough to test with real customers.

Proof of concept

A quick build that shows the core idea can work at all. Looks don't matter.

Feasibility

Whether something can be done technically, at a cost and in a time that make sense.

Action log (issue log, action items)

One list of who owes what: each action, who it's on, when it's due, and whether it's done. Your Project Manager Bot keeps yours, and it shows on your review page.

Risk register

A list of what could go wrong, how likely, how bad, and what is being done about it. Read more: Asana — Risk register template

Go / hold / drop

The decision at the end of every stage: keep going, pause, or stop the project.

Lessons learned

A short note at the end of a stage on what worked and what didn't, so the next project goes better. Read more: Atlassian — Retrospective template

Git

A free tool that keeps a saved history of the files in a folder, so you can see what changed and go back to an earlier version. It keeps only what was saved to it (committed); very large files are usually kept elsewhere and linked. It is traditionally used for software because it is so good at version control, and version control is exactly what project records need too. We very highly recommend it.

Version control

Keeping track of every version of a file: what changed, when, by whom, and being able to go back. Git does this automatically.

Repository (repo)

A folder Git keeps history for. Your AN-Creation folder can be one.

Commit (checkpoint)

A saved snapshot of the files at one moment, with a short note about what changed.

Push / clone

Push sends your commits to an online copy; clone makes a full copy of a repository somewhere else, like a new computer.

GitHub

An online service that holds a copy of a Git repository. A private repository is an offsite copy that only you, the people you invite and the services you connect can see.

Design and engineering terms

Industrial design (ID)

Designing how a product looks, feels and is used: form, ergonomics, color, finish. Usually the first design loops. Read more: IDSA — What is industrial design?

Concept

An early idea of the product, usually sketches or renders, before detailed engineering.

Render

A realistic computer picture of a design that doesn't exist yet.

Mock-up

A physical model that shows size and shape, often in foam or printed plastic. It doesn't work.

CAD (Computer-Aided Design)

Software for making exact 3D models and drawings of parts. The CAD is the master description of the design.

STEP file

A common CAD file format that almost every CAD program and shop can open.

Drawing (print)

A 2D document with views, dimensions, tolerances, materials and notes. What a shop quotes and inspects against.

Tolerance

How far a dimension may vary and still be acceptable: 10.0 plus or minus 0.1 mm. Read more: ASME Y14.5 — Dimensioning and tolerancing

GD&T (Geometric Dimensioning and Tolerancing)

A standard symbol language on drawings for controlling shape, position and orientation, not just size. Read more: ASME Y14.5 — Dimensioning and tolerancing

Tolerance stack-up

Adding up how the tolerances of mating parts combine, to check the assembly still fits and works at the extremes. Read more: NIST — Tolerance synthesis scheme

Datum

A reference surface or point that dimensions are measured from. Read more: ASME Y14.5 — Dimensioning and tolerancing

BOM (Bill of Materials)

The list of every part and material in the product, with quantities, and in our case estimated costs.

Revision

A version of a design. We use C1, C2 for concepts, X1, X2 for working revisions, and A, B, C once released.

DFM (Design for Manufacturing)

Designing a part so it is easy and cheap to make with the chosen process. We start it from the first sketch. Read more: Protolabs — Process-specific design tips

DFA (Design for Assembly)

Designing so the product goes together quickly and correctly, with fewer parts and fewer ways to get it wrong.

Draft angle

A slight taper on molded or cast walls so the part comes out of the tool. Read more: Protolabs — Draft angle guidelines

Wall thickness

How thick a molded part's walls are. Uneven walls cause sink marks and warping. Read more: Protolabs — Uniform wall thickness in molded parts

Undercut

A feature that stops a part from coming straight out of a mold. Needs extra tool action, which adds cost.

FEA (Finite Element Analysis)

Computer simulation of stress, bending or heat in a part. A guide, not a guarantee; real tests confirm it.

Ergonomics (human factors)

Designing to fit the human body and how people actually use things. Read more: NIOSH — Ergonomics overview

Usability

How easily people can use a product correctly the first time. Formal for medical devices. Read more: IEC — IEC 62366-1 usability engineering

Mechanism

The moving parts that make the product do its job.

Enclosure

The case or housing around the inside parts, often what gets sealed against water and dust.

Quality terms

QMS (written procedures, checks and records)

A company's written system for making sure products come out right and problems get fixed.

ISO 9001

A publisher reference for documented business processes. Applicability depends on the project; the Office does not establish compliance. Read more: ISO 9001 — Quality management

ISO 13485

The quality management standard for medical devices. Read more: ISO 13485 — Medical-device quality

AS9100

The quality management standard for aviation, space and defense. Read more: IAQG — Aerospace quality standards

IATF 16949

The quality management standard for automotive suppliers. Read more: IATF 16949 — Automotive quality

Compliance matrix

One list of everything the product must meet, the data each item needs, how it is checked, and whether it is met. Also called a requirements or verification matrix. Read more: NASA — Requirements verification matrix

FMEA (Failure Mode and Effects Analysis)

A table of what could fail, how bad it would be, how likely, how it would be caught, and what is being done about it. Read more: ASQ — Failure mode and effects analysis

DFMEA / PFMEA (Design FMEA / Process FMEA)

A DFMEA looks at failures from the design; a PFMEA looks at failures from how the product is made. Read more: ASQ — Failure mode and effects analysis

RPN (Risk Priority Number)

Severity times occurrence times detection, each scored 1 to 10, used to rank FMEA rows. Severe safety items get attention whatever the number. Read more: ASQ — Failure mode and effects analysis

Control plan

What gets checked during production, how, how often, and what happens when it is off. Read more: AIAG — Connected quality core tools

Critical characteristic

A feature that matters most for safety, regulations or function, so it gets extra control: a defined check, how often, and what to do if it fails. The control plan sets the frequency; not every part is always checked. Also called special or key characteristic.

CTQ (Critical to Quality)

A feature the customer cares about enough that it must be controlled.

DVP&R (Design Verification Plan and Report)

The list of tests and checks for a design, with their results. Our compliance matrix covers it.

Verification

Checking that the product was built to the spec: did we build it right? Read more: NASA — Product realization, verification and validation

Validation

Checking that the product does the job for real users in real conditions: did we build the right thing? Read more: NASA — Product realization, verification and validation

First article inspection (FAI)

Measuring every dimension and note on the drawing on the first parts from a production setup, and recording the results.

PPAP (Production Part Approval Process)

The auto industry's package of evidence that production parts match the design and the process is stable. Sized to the project here. Read more: AIAG — Connected quality core tools

Process capability (Cp, Cpk)

Numbers that say how consistently a process holds a dimension within its tolerance. Higher is better; 1.33 is a common target.

MSA / Gauge R&R (Measurement System Analysis / Gauge Repeatability and Reproducibility)

Checking that the way you measure gives the same answer every time and from person to person.

SPC (Statistical Process Control)

Tracking measurements over time on charts to spot a process drifting before it makes bad parts. Read more: ASQ — Quality tools directory

Poka-yoke (mistake-proofing)

Designing a part or process so it can't be done wrong, like a plug that only fits one way. Read more: ASQ — Mistake-proofing (poka-yoke)

Root cause analysis

Finding the real reason something failed, not just the symptom. Read more: ASQ — Root cause analysis

Five whys

Asking 'why?' about five times in a row to dig from a symptom down to a root cause. Read more: ASQ — Five Whys

Corrective action

A fix for a problem that also stops it from happening again. CAPA in medical, 8D in automotive.

Nonconformance

A part or product that doesn't meet its spec.

Golden sample

An approved part kept as the physical reference for what good looks like.

AQL (Acceptable Quality Limit)

A sampling rule for inspecting a batch: check this many, accept the lot if no more than this many are bad.

Traceability

Being able to tell which batch, material or machine a part came from. Required in aviation and medical.

Design history file (DHF)

The full record of how a design got where it is. Required for medical devices; useful for anyone.

Change control

The rule that every change after freeze gets recorded, checked for what it affects, and approved.

ECO / ECN (Engineering Change Order / Notice)

The paperwork for a formal design change after release. Our change record does this job.

Testing and certification terms

Certification

A lab or authority confirming a product meets a standard. Often required before a product can be sold. Read more: NIST — Laboratory accreditation versus certification

Listing (UL, ETL)

A recognized test lab's mark showing a product was tested to a safety standard and is followed up in production. Read more: OSHA — Nationally Recognized Testing Laboratories

NRTL (Nationally Recognized Testing Laboratory)

A lab OSHA recognizes to test and certify products for safety in the U.S. UL, Intertek (ETL) and CSA are examples. Read more: OSHA — Nationally Recognized Testing Laboratories

UL

A safety science organization whose standards and listing mark are widely required for electrical products in the U.S. Read more: UL Standards & Engagement — Electrical standards

FCC (Federal Communications Commission)

The U.S. agency whose rules cover anything that radiates radio energy, from Bluetooth to fast electronics. Read more: FCC — Equipment authorization

FCC Part 15

The FCC rules for devices that emit radio energy, intentionally (radios) or not (digital circuits). Read more: eCFR — 47 CFR 15.31 measurement standards

Pre-certified module

A radio module that already has FCC approval, which saves a lot of testing when it is used as approved. Read more: eCFR — 47 CFR 15.212 modular transmitters

EMC / EMI (Electromagnetic Compatibility / Interference)

Whether electronics give off radio noise or are upset by it. Read more: TÜV SÜD — EMC test planning and laboratory preparation

Pre-compliance testing

A cheap early test before the formal lab, to find problems while they are still easy to fix. Read more: Tektronix — EMI precompliance during development

CE marking

The mark showing a product meets the EU rules that apply to it. Required only for product types whose EU rules call for it (toys, electrical equipment, machinery and others); many products don't carry it. The rules for your product decide. Read more: Your Europe — CE marking

RoHS (Restriction of Hazardous Substances)

EU limits on lead, mercury, cadmium and similar substances in electronics. Read more: European Commission — RoHS Directive

REACH

EU rules on chemicals in products, including substances of very high concern. Read more: ECHA — REACH regulation

Prop 65 (California Proposition 65)

California's rule requiring warnings on products that expose people to listed chemicals. Read more: California Proposition 65 — For businesses

CPSC (Consumer Product Safety Commission)

The U.S. agency for consumer product safety, including recalls and children's product rules. Read more: CPSC — Small business product-safety resources

CPSIA / Children's Product Certificate (Consumer Product Safety Improvement Act)

U.S. rules for products for children 12 and under: third-party testing and a certificate. Read more: CPSC — Children’s products

FDA device class

Medical devices are Class I, II or III by risk. The class decides how heavy the FDA's path is. Read more: FDA — Classify your medical device

510(k)

The most common FDA premarket submission, showing a device is substantially equivalent to one already sold. Read more: FDA — Premarket submissions (510(k), De Novo, PMA)

IP rating (Ingress Protection)

A two-digit code for protection against dust and water. IP67 means dust-tight and survives brief submersion. Read more: IEC 60529 — Enclosure protection (IP Code)

NEMA rating

The U.S. enclosure rating system for protection against environments, used for electrical and industrial gear. Read more: NEMA enclosure Types — ANSI catalog

MIL-STD (Military Standard)

U.S. defense standards. MIL-STD-810 covers environmental testing; MIL-STD-461 covers interference. Read more: MIL-STD-810 — Environmental engineering and laboratory tests

Drop test / ISTA (International Safe Transit Association)

Tests that a packaged product survives shipping. ISTA publishes the common procedures. Read more: ISTA — Getting started with design and testing

ESD (Electrostatic Discharge)

A static shock that can damage electronics. Products are tested for it. Read more: IEC 61000-4-2:2025 — ESD immunity test method

UN 38.3

The test lithium batteries must pass before they can be shipped.

Accredited lab

A test lab independently confirmed as competent for specific tests. Read more: NIST NVLAP — Accredited laboratory directory

Manufacturing and tooling terms

Injection molding

Melting plastic and forcing it into a steel or aluminum mold. Expensive tools, very cheap parts at volume. Read more: Protolabs — Process-specific design tips

Tooling (tool, mold, die)

The custom hardware that shapes parts in production. Usually the biggest up-front manufacturing cost.

Soft tooling / hard tooling

Soft (aluminum or temporary) tools are cheaper and faster but wear out; hard (steel) tools cost more and last for a long run.

Cavity

One part-shaped space in a mold. A four-cavity mold makes four parts per shot.

Steel-safe

Designing so later tool changes remove steel rather than add it back. Removing is cheap; welding back is not.

Mold-flow analysis

Simulation of how plastic fills a mold, to find problems before the tool is cut.

T-trial (T0, T1) (Tool trial)

Running a new tool to see if it makes the part. Usually one or two before the tool is right.

P-trial (Process trial)

Running the process at production rate to check quality holds, after the tool is right.

Pilot run

A short production run to prove the process before full production.

CNC machining (Computer Numerical Control)

Cutting parts from solid metal or plastic with computer-controlled tools. Good for prototypes and low volume. Read more: Xometry

Sheet metal

Parts cut and bent from flat metal sheet. Read more: SendCutSend — Cut and bent sheet parts

Casting

Pouring molten metal into a mold. Die casting uses steel molds for volume.

3D printing (additive)

Building parts layer by layer. Fast for prototypes; some processes are fine for low-volume production. Read more: JLC3DP — 3D printing

PCB / PCBA (Printed Circuit Board / Assembly)

The board that holds and connects electronic parts. PCBA is the board with parts soldered on. Read more: JLCPCB — Circuit boards and assembly

Contract manufacturer (CM)

A company that builds your product for you to your design.

OEM / ODM (Original Equipment / Design Manufacturer)

An OEM makes a product under its own name or to a buyer's design; an ODM designs and makes products that others brand.

Fixture / jig

A custom holder that locates a part the same way every time, for machining, assembly or measuring.

Gauge

A tool or instrument for checking a dimension, from calipers to a custom go/no-go gauge.

Cycle time

How long one production cycle takes, such as one mold shot. Drives part cost.

Yield / scrap rate

The share of parts that come out good / the share that are thrown away.

Work instructions

Step-by-step directions for assembling or making the product.

Process flow

The ordered steps from raw material to boxed product.

Packaging

The box, inserts and labels. It has to protect the product and meet store and shipping rules.

Sourcing and supply terms

RFQ (Request for Quote)

A package sent to suppliers asking them to price making your part: drawings, quantities, material, finish, delivery. Read more: NIST MEP — Supplier scouting inquiry fields

Quote

A supplier's price and terms for a defined job. Compare quotes on the same revision and quantity.

MOQ (Minimum Order Quantity)

The smallest order a supplier will accept.

Unit cost / part cost

What one finished product costs to make, from the BOM, labor and overhead.

Landed cost

The full cost of getting a product to your door: price, shipping, duty, insurance.

Tooling cost (NRE) (Non-Recurring Engineering)

One-time costs like tools, fixtures and setup, paid once rather than per part.

Make or buy

Deciding whether to make a part yourself or buy it, often off the shelf.

Off-the-shelf / COTS (Commercial Off-The-Shelf)

A standard part you can buy instead of designing a custom one. Read more: McMaster-Carr — Hardware and ready-made CAD

Single source / second source

Relying on one supplier, or qualifying a backup in case the first one fails.

Supplier qualification

Checking a supplier can make the part, inspect it and deliver reliably before you depend on them.

Incoterms (FOB, EXW, DDP)

Standard terms for who pays shipping and carries risk at each point. FOB: seller loads it on the ship; DDP: seller delivers to you, duty paid.

HS code / tariff (Harmonized System)

The customs code for a product type, which sets the import duty.

Purchase order (PO)

Your formal order to a supplier, with quantity, price and terms.

Net 30

Payment terms: the invoice is due 30 days after it is issued.

Patent and legal terms

Patent

A government grant that lets you stop others from making, using or selling your invention for a limited time, in return for publishing how it works. Read more: USPTO — Patent basics

Utility patent

The usual patent, covering how something works or is made. Lasts about 20 years from filing. Read more: USPTO — Patent basics

Design patent

A patent on how a product looks, not how it works. Read more: USPTO — Design patents

Provisional patent application

A lower-cost U.S. filing that sets an early filing date, but only for what it actually describes. To keep that date you must file a full (non-provisional) application within 12 months. It is never examined and never becomes a patent by itself. Read more: USPTO — Provisional patent applications

Non-provisional application

The full patent application that gets examined. Read more: USPTO — Inventors Assistance Center and filing checklists

Claims

The numbered sentences at the end of a patent that define exactly what is protected. The most important part.

Prior art

Anything public before your filing date that shows the same idea: patents, products, articles, videos. Read more: Google Patents — Patent and prior-art searching

Prior-art search

Searching for prior art to judge whether an idea is new enough to patent. Read more: USPTO — Patent Public Search

Freedom to operate (FTO)

Whether you can sell your product without infringing someone else's live patent. Having your own patent doesn't answer this. Read more: Patentability versus freedom to operate (Mondaq)

Patent pending

You may mark a product this way once an application is filed. It warns copiers but doesn't give enforceable rights yet.

Grace period

In the U.S., you have one year to file after your own public disclosure. Many countries give no grace period. Read more: Patent grace periods and public disclosures (Sterne Kessler)

Public disclosure

Showing, publishing, selling or offering to sell the invention. It starts the patent clock. Read more: Patent grace periods and public disclosures (Sterne Kessler)

Patent attorney / patent agent

Professionals registered to file patents. Attorneys can also give legal advice and go to court. Read more: USPTO — Find a patent practitioner

Trademark

A protected brand name, logo or slogan. Read more: USPTO — Trademark basics

Copyright

Protection for creative works like manuals, photos and software code.

Trade secret

Valuable information protected by keeping it secret, such as a formula or process. Read more: USPTO — Trade secret toolkit

License / royalty

Letting someone else make and sell your invention / the payment you get, often a percentage per unit.

Infringement

Making, using or selling something covered by someone else's live patent or trademark without permission. Read more: USPTO — Patent rights, ownership and infringement

Product liability

Legal responsibility when a product hurts someone. Read more: SBA — Get business insurance

Business and company terms

Business plan

A written plan for how the product becomes a business: what you sell, to whom, how, what it costs, and how it makes money. Investors and lenders usually ask for one; a short version helps anyone decide what to do next. Read more: Sequoia — Writing a business plan

Business model

How the business makes money: sell product, license it, sell through stores, subscriptions. Read more: Strategyzer — Business Model Canvas

Business Model Canvas

A one-page way to sketch a business model in nine boxes. Read more: Strategyzer — Business Model Canvas

Value proposition

Why a customer would choose your product over what they use now, in a sentence. Read more: Strategyzer — Value Proposition Canvas

LLC (Limited Liability Company)

A simple company form that can put the business's liability on the company instead of on you, if set up and run properly. Read more: SBA — Launch your business

Corporation (C-corp, S-corp)

Other company forms. C-corps are common when raising investor money; S-corps are a tax election. Read more: SBA — Launch your business

Sole proprietor

Doing business as yourself with no separate company. Simple, but the liability is yours. Read more: SBA — Launch your business

EIN (Employer Identification Number)

The IRS number that identifies a business, like a Social Security number for a company. Free from the IRS. Read more: IRS — Get an EIN directly, for free

Articles of organization

The document filed with your state to form an LLC. Read more: SBA — Find your state registration office

Operating agreement

The LLC's internal rules: who owns what, who decides, what happens if someone leaves.

Registered agent

The person or service that receives legal papers for your company in its state.

Insurance: general and product liability

General liability covers injuries and damage from your business; product liability covers harm caused by your product. Stores often require proof. Read more: SBA — Get business insurance

W-9

The IRS form a business gives customers so they can report payments to it.

COGS (Cost of Goods Sold)

What it costs to make the products you sold.

Gross margin

Price minus the cost to make it, as a share of price. It has to cover everything else and leave profit. Read more: Sales, price and the money left per unit

Markup

How much is added to cost to set a price. Not the same as margin.

Wholesale / retail / MSRP (Manufacturer's Suggested Retail Price)

Wholesale is what a store pays you; retail is what the customer pays; MSRP is the price you suggest.

Break-even

The number of units you must sell to cover all your costs.

Cash flow

Money coming in and going out over time. Many young businesses fail from running out of cash, not from losing money.

P&L (Profit and Loss statement)

A summary of income, costs and profit over a period. Read more: SCORE — Financial Projections Template

Balance sheet

A snapshot of what a business owns, what it owes, and what is left for the owners.

Financial projections

Estimates of sales, costs and cash for the coming years. Lenders and investors ask for them. Read more: SCORE — Financial Projections Template

SCORE / SBDC (Small Business Development Center)

Free or low-cost business mentoring and help, supported by the SBA. Read more: SCORE — Find a business mentor

Money, funding and banking terms

Bootstrapping

Paying for the project yourself, from savings or early sales, without outside investors.

Friends and family round

Early money from people you know, often on simple terms. Put it in writing anyway.

Angel investor

An individual who invests their own money in early companies, usually for equity. Read more: Angel Capital Association — Member directory

Venture capital (VC)

Firms that invest other people's money in companies they expect to grow very large.

Seed round / Series A

The first sizable investment round / the next, larger round. Inventor products often raise one round for design and prototypes and another before tooling.

Equity

Ownership. Selling equity means giving up part of the company in exchange for money.

Dilution

Your share of ownership shrinking as new shares are sold to investors.

Valuation (pre-money, post-money)

What the company is agreed to be worth before / after new investment.

Convertible note / SAFE (Simple Agreement for Future Equity)

Early investment that turns into shares later, at the next priced round. Read more: SEC — Early-stage investors

Term sheet

A short, mostly non-binding summary of an investment deal's key terms.

Due diligence

The checking investors or lenders do before committing: your plan, numbers, IP and legal setup.

Pitch deck

A short slide presentation for investors: problem, product, market, business model, team, the ask.

Use of funds

What the money you raise will pay for, item by item. Read more: Prepare for funding and finance conversations

Runway / burn rate

How many months your cash lasts / how fast you spend it each month.

Crowdfunding

Raising money from many people, often as pre-orders (Kickstarter) or small investments (equity crowdfunding). Read more: Kickstarter — Creator Handbook

SBA loan

A bank loan partly guaranteed by the Small Business Administration, which makes lenders more willing. Read more: SBA — Lender Match preparation

Line of credit

A loan you can draw on as needed up to a limit, paying interest only on what you use.

Collateral / personal guarantee

Property pledged to secure a loan / your personal promise to repay if the business can't.

Grant / SBIR (Small Business Innovation Research)

Money that doesn't have to be repaid. SBIR is federal research funding for small businesses. Read more: SBIR / STTR — Federal research funding

Strategic partner

A company that invests or helps for business reasons, such as a manufacturer or tool shop that does your tooling in exchange for a stake or the production work.

ROI (Return on Investment)

What you get back compared with what you put in.

Sales, marketing and retail terms

Go-to-market (GTM)

The plan for how the product reaches customers: who, where, what price, how they hear about it.

Marketing plan

Who the product is for, how you'll reach them, the message, the price and the budget. Read more: HubSpot Academy — Digital marketing course

Target market / customer persona

The specific group most likely to buy / a sketch of one typical buyer.

TAM / SAM / SOM (Total / Serviceable / Obtainable Market)

The whole market, the part you could serve, and the part you can realistically win.

Channel

Where the product is sold: your own website, Amazon, stores, distributors, sales reps.

Distributor / sales rep

A company that buys and resells your product / a person or firm who sells it for a commission. Read more: Trade.gov — Evaluating representatives

Sell sheet

A one-page summary of the product for buyers: what it does, photos, specs, price. Read more: Amazon, Walmart and Lowe’s: getting ready for buyers

Buyer packet

What a store or buyer asks for: spec sheet, certificates, insurance, tax form, vendor registration, quote.

UPC / GTIN (Universal Product Code / Global Trade Item Number)

The barcode number stores need. Bought through GS1. Read more: GS1 US — Product identifiers and barcodes

SKU (Stock Keeping Unit)

Your own code for each product variant you stock.

Marketplace

Selling through someone else's site, like Amazon or Walmart Marketplace, under their rules and fees. Read more: Amazon — Seller registration guide

Private label

A product made by one company and sold under another's brand.

CAC (Customer Acquisition Cost)

What it costs in marketing and sales to win one customer.

Conversion rate

The share of people who take the next step, such as visitors who buy.

SEO (Search Engine Optimization)

Making your website easy for search engines to find and show. Read more: Google — Search Engine Optimization Starter Guide

Pre-orders

Taking orders before the product is made. Proves demand and can help fund production. Read more: Kickstarter — Creator Handbook

Truth in advertising

Claims about your product must be true and backed by evidence. Read more: FTC — Advertising and marketing guidance

Plain explanations of these tools, written for bot work, are in the hotbotspot tool library.

Everything here is a starting point. Work with artificial intelligence always needs tuning, so test it and dial it in for your own work, data and model before you rely on it.