Guide

From an idea to a product.

Practical questions for the next decision, with evidence, owners and a clear next step.

Ten check sheets · Revision 1

Download the editable worksheet (CSV) · Complete instructions for assistants · Structured library

Read or print this page, or download a copy to fill in with your assistant. Answers are saved in your project files; this reference page does not save project answers.

Keep going: risk reviews lead to action

Keep going (the procedures call it Advance Now) means take a useful step today. Treat risk analysis as a source of questions, opportunities and routes through the problem. Ordinary uncertainty, imperfect ergonomics, limited funds, unanswered checklist items or a long list of possible failures do not automatically stop the project. Preserve momentum. Help the inventor find the next useful action, carry it out with the tools and authority available, and keep the concern visible.

Keep a short list of unresolved concerns, possible routes, questions for the right person and work that advances now. Reuse existing risk and issue IDs. Hold only an affected activity when a concrete limit applies; continue other useful work. Carry the questions into supplier, professional and customer conversations.

Read the shared principle · Instructions for assistants · Roadblock and opportunity list

Use the sheet for the next decision.

Original A.N. Creation working templates, informed by the linked primary sources. They are not official agency forms, a universal standard, or proof of approval. U.S. starting points; confirm product, jurisdiction, market and recipient before applying requirements.

  1. Your Project Manager Bot is the new-product-development project manager. It coordinates the work, dependencies, review decisions and next actions; each specialist owns the evidence in their subject area.
  2. Listen to the idea first. Select the sheet for the next decision and ask one or two useful questions at a time. Reuse answers already in project records; do not make a new inventor complete the whole library.
  3. For each applicable item record the answer, status (unknown, estimate, evidence recorded, reviewed, or not applicable with reason), evidence file and revision or source URL/date, owner, next action and reviewer. A filled box is not evidence that a test, search, filing or approval occurred.
  4. Save a dated project copy in the sheet’s subject folder, following the existing project layout and revision rules. Preserve earlier issued revisions. Send your Project Manager Bot a short update with the exact file/revision, unresolved decisions and agreed next step; your Project Manager Bot updates the master plan.
  5. Check current official sources and actual recipient requirements when used. Record what you actually read, dates and limitations. If a source is inaccessible, report that and leave the dependent requirement unverified. These references do not grant permission to copy paid standards.
  6. Use go, revise, hold or stop at a project review, with the person’s decision, evidence and remaining conditions. A project decision is separate from regulatory clearance, retailer acceptance, legal review or test validation. Do not send, apply, file, buy or publish without the person’s authorization.

Record with every project copy: Project; Product revision; Sheet revision; Prepared by; Date; Target market / jurisdiction; Decision being prepared; Item ID; Answer / assumption; Status; Evidence / exact revision / URL and date; Owner; Next action; Reviewer / review date; Not-applicable reason.

The CSV includes all questions with blank answer, evidence and review columns. Filter it by sheet; mark unused items not applicable with a reason.

The project manager / the design role, the funding role, the marketing role, the engineering role

New product development: the project review

When: Start after hearing the idea; revisit before major spending, tooling, funding or launch.

Keep: A concise project brief, assumptions, milestone plan and recorded review decision.

Save in: product/concept/; links and agreed work in root plan.md

  1. Who will use it, who pays, and what problem is worth solving?Name the user, buyer, task, alternatives and evidence from actual conversations. Separate founder beliefs from observations.PROJECT-01 · Answer / status / evidence / owner / next action / review
  2. What are we making, and what is outside the first version?Concept revision, intended use, must-have outcomes, exclusions and measurable success criteria where known.PROJECT-02 · Answer / status / evidence / owner / next action / review
  3. How many might we sell, at what price, through which channel and by when?Low/base/high units by month or quarter, geography and channel. Show prospects × purchase rate × units or stores × units per store per week × weeks. Record assumptions and capacity limits; market size is not a sales forecast.PROJECT-03 · Answer / status / evidence / owner / next action / review
  4. What evidence says someone will buy it?Dated interviews, observed problems, price tests, pilots, orders or other evidence. Distinguish interest, nonbinding intent, paid orders and repeat sales.PROJECT-04 · Answer / status / evidence / owner / next action / review
  5. What must be learned before the next investment?Open customer, IP, safety, technical, cost and channel risks; one next experiment, owner, finish condition and capped budget.PROJECT-05 · Answer / status / evidence / owner / next action / review
  6. What are the milestones and dependencies?Concept review → feasibility and economics → prototype/user evidence → production readiness → launch → post-launch review. Tailor the sequence; do not imply every gate is already passed.PROJECT-06 · Answer / status / evidence / owner / next action / review
  7. Who owns each result and decision?Named responsible people/assistants, exact inputs and revisions, agreed review participants and dates only when agreed.PROJECT-07 · Answer / status / evidence / owner / next action / review
  8. Should we go, revise, hold or stop?Evidence reviewed, decision author/date, unresolved conditions, authorized next work and links to the exact released files. Revisit downstream sheets when an input changes.PROJECT-08 · Answer / status / evidence / owner / next action / review

Source guidance: NIST MEP — Product design and development · SBA — Business planning and market research

The funding role / the project manager, the marketing role

Sales, price and the money left per unit

When: Before choosing a price, requesting production quotes or committing to a sales channel.

Keep: A channel-by-channel low/base/high unit-economics model and cash forecast.

Save in: business/finance/

The 25% rule is a starting target, not a universal law: a factory cost of $0.25 against $1.00 retail leaves room for other parties and expenses, but does not establish your profit. Validate the actual channel economics.

Illustrative assumptions only: retail $1.00; retailer buys at $0.50. Retailer gross margin is 50%, while markup on its cost is 100%. You receive $0.50. Factory cost $0.25 plus inbound freight/duty/packaging $0.05 gives $0.30 landed cost. Your gross profit before other selling costs is $0.20 (40% of your revenue). Another $0.10 of variable selling/returns costs leaves $0.10 contribution before fixed overhead, financing and tax. If a distributor buys from you at $0.40 instead, the same costs leave zero contribution. All numbers are examples, not quoted terms.

At $0.10 contribution, $10,000 of period fixed costs takes 100,000 sold units to break even under those assumptions. Show tooling recovery separately if it is not included. A tiny selling price is illustrative; minimum fees and fixed handling costs can dominate actual low-price products.

  1. What will the customer pay, and what will we actually receive?Retail price excluding sales tax, discounts and refunds, and wholesale sell-in price. For marketplaces distinguish sales revenue from cash payouts after withheld fees; deduct those fees only once. Model direct, marketplace, retailer, distributor and licensing routes separately.ECONOMICS-01 · Answer / status / evidence / owner / next action / review
  2. How many will we sell over a stated period?Units by channel and timing, evidence, confidence and sensitivity. Reconcile production orders, inventory and returns with sell-through; unsold stock is not revenue.ECONOMICS-02 · Answer / status / evidence / owner / next action / review
  3. What does one acceptable unit cost at each realistic quantity?Dated quote versus estimate; materials, bought parts, assembly, packaging, inspection, scrap and yield. Keep one-time tooling separate; show any amortization assumption.ECONOMICS-03 · Answer / status / evidence / owner / next action / review
  4. What does it cost to get that unit ready to sell?Inbound freight, duty/tariff where applicable, broker fees and receiving. Define landed cost and included items consistently; record currency, trade terms and quote date.ECONOMICS-04 · Answer / status / evidence / owner / next action / review
  5. What other costs happen when we sell one?Channel fees, fulfillment/storage, outbound freight, sales commissions, promotion/advertising, payment fees, returns, warranty and chargebacks where applicable. Mark items already included to avoid double counting.ECONOMICS-05 · Answer / status / evidence / owner / next action / review
  6. What margin and contribution remain?Gross margin = (our net sales − consistently defined cost of goods sold) / our net sales. Contribution = our net sales − all variable costs. Markup = (selling price − cost) / cost. Name whose margin each number describes.ECONOMICS-06 · Answer / status / evidence / owner / next action / review
  7. How many units cover fixed costs, and when does cash run short?List period fixed costs such as rent, salaried/admin costs, insurance and fixed advertising/storage; split mixed costs into fixed and variable parts. Break-even units = period fixed costs / positive contribution per unit, rounded up; no finite break-even if contribution is zero or negative. Combined products/channels need an assumed sales mix. Track deposits, tooling, inventory, payment delays, taxes, debt service and reserve separately from accounting profit.ECONOMICS-07 · Answer / status / evidence / owner / next action / review
  8. Which assumptions could make this unattractive?Test lower realized price/volume, higher freight/returns/advertising and slower collections. Record minimum acceptable contribution, peak cash need and the next quote or customer test.ECONOMICS-08 · Answer / status / evidence / owner / next action / review

Source guidance: SBA — Business planning and market research · Amazon — Selling fees and calculator

The design role / the engineering role, the prototype role

People, use and ergonomic design

When: While comparing concepts and again with representative prototypes.

Keep: Use scenarios, measurable user needs, observed trials and a design-change list.

Save in: product/concept/

NIOSH workplace and hand-tool guidance supplies screening questions. Adapt it to the intended users and task; hand-tool dimensions are not universal product limits.

  1. Who uses it, and who may struggle with it?Actual intended ages, abilities, hand/body sizes, left/right-handed use, strength, gloves and assistive needs. Do not design only for the founder or an average body.ERGONOMICS-01 · Answer / status / evidence / owner / next action / review
  2. Where and how will people use, carry and store it?Lighting, wet/dirty use, temperature, clothing, workspace, reach, frequency, duration and one- versus two-handed tasks.ERGONOMICS-02 · Answer / status / evidence / owner / next action / review
  3. Can they grip, lift, reach and operate it comfortably?Observe posture, reach, grip span, contact pressure, weight, balance, repetition and required force. Measure relevant dimensions and effort; do not invent a universal comfortable force.ERGONOMICS-03 · Answer / status / evidence / owner / next action / review
  4. Can a first-time user understand controls and feedback?Setup, labels, visibility, tactile cues, mistakes, recovery and instructions; accessibility needs and actual observed misunderstandings.ERGONOMICS-04 · Answer / status / evidence / owner / next action / review
  5. What foreseeable misuse or contact could hurt someone?Pinch, cut, burn, tip, choke, electrical and other applicable hazards, including children/bystanders. Feed design changes and safety requirements to the engineering role.ERGONOMICS-05 · Answer / status / evidence / owner / next action / review
  6. Can it be cleaned, maintained and put away?Contact materials, residues, cleaning agents, disassembly, consumables, storage, service and disposal scenarios.ERGONOMICS-06 · Answer / status / evidence / owner / next action / review
  7. What did representative users actually do?Prototype revision, participants and relevant characteristics, tasks, consent, observations, errors, discomfort, completion measures and limits. Small trials are learning evidence, not population-wide proof.ERGONOMICS-07 · Answer / status / evidence / owner / next action / review
  8. Which design changes are required before the next prototype?Trace each requirement/change to an observation or stated need, owner and retest. Keep aesthetics, usability and engineering feasibility linked.ERGONOMICS-08 · Answer / status / evidence / owner / next action / review

Source guidance: NIOSH — Ergonomic risk factors and checklists · CPSC — Small business product-safety resources · NIOSH — Non-powered hand-tool selection guide

The legal role / the project manager, the design role, the marketing role

What to protect, and why

When: Before public disclosure, a supplier disclosure, investor sharing or a protection decision.

Keep: An invention disclosure, dated disclosure history and focused professional-review brief.

Save in: company/intellectual-property/

  1. What business outcome do you want from protection?Exclude copying of a useful mechanism, protect appearance/brand, license, sell rights, attract investment, keep know-how secret or deliberately publish. Record markets, time horizon and budget.IP-01 · Answer / status / evidence / owner / next action / review
  2. Exactly what do you believe is new?Explain the technical problem, mechanism/process, alternatives, differences, drawings and versions. Identify what may be functional, ornamental, or branding; do not turn a vague idea into a patentability conclusion.IP-02 · Answer / status / evidence / owner / next action / review
  3. What related products and publications are known?Dated searches, terms, jurisdictions/classes, relevant documents/claims and unanswered questions. An initial search is not proof of novelty or completeness.IP-03 · Answer / status / evidence / owner / next action / review
  4. Who contributed, owns rights or has contractual interests?Contributors and what they contributed; employment, assignments, contractor terms, university/sponsor interests and agreements. Inventorship, patent ownership, company shares and project access are different.IP-04 · Answer / status / evidence / owner / next action / review
  5. What has already been disclosed or offered for sale?Exact dates, material/revision, audience, public demos, crowdfunding, online posts, offers and sales. Have relevant filing options assessed before further disclosure; do not assume a worldwide grace period.IP-05 · Answer / status / evidence / owner / next action / review
  6. Which protection route fits the objective?Utility patent versus design patent, trademark or trade secret as applicable; costs, territories, timing, discoverability/reverse engineering and practical secrecy measures. A provisional is not an issued patent and does not cover design inventions.IP-06 · Answer / status / evidence / owner / next action / review
  7. Could making or selling it infringe someone else’s rights?Separate patentability research from freedom-to-operate review of relevant claims, territory, product and dates. A patent grants an exclusion right, not permission to manufacture or sell.IP-07 · Answer / status / evidence / owner / next action / review
  8. What is the decision, and what needs professional review?Exact questions, proposed protection/licensing approach, ownership gaps, disclosure urgency and dated decision. Record actual applications/receipts only if they exist; a draft or checklist is not a filing.IP-08 · Answer / status / evidence / owner / next action / review

Source guidance: USPTO — Patent rights, ownership and infringement · USPTO — Provisional patent applications · USPTO — Trade secret toolkit · USPTO — Trademark basics · USPTO — Design patents

The engineering role / the design role, the project manager, the prototype role

Design for manufacture and assembly

How to use FMEA, tolerance stack-up, GD&T and mistake-proofing · Short design-review worksheet

When: Before prototype quotes, tooling release and any production design change.

Keep: A reviewed DFM/DFA record, requirements and matched manufacturing package.

Save in: product/engineering/; requirements in product/requirements/

  1. What performance and safety requirements drive the design?Intended use, loads, life, environment, interfaces, applicable market rules and acceptance criteria with sources.DFM-01 · Answer / status / evidence / owner / next action / review
  2. Does the process fit material, geometry and volume?Compare machining, molding, casting, sheet metal, additive or other processes against quantity, finish, lead time, tooling and total cost; identify process-specific risks.DFM-02 · Answer / status / evidence / owner / next action / review
  3. Are features realistic for the chosen process?For molding: walls, draft, ribs/bosses, undercuts, shrinkage and ejection. For machining: tool access, deep pockets and corner radii. For sheet metal: bends, radii and hole spacing. Obtain the actual supplier’s limits; no universal wall/draft number.DFM-03 · Answer / status / evidence / owner / next action / review
  4. Are tolerances functional and inspectable?Critical dimensions, datums, fits, tolerance stack-ups, finishes and inspection methods. Avoid needless tight tolerances; specify those required for function or safety.DFM-04 · Answer / status / evidence / owner / next action / review
  5. Can the parts be assembled consistently?Reduce unnecessary parts/fasteners, use standard components, access tools, orient and locate parts, prevent wrong assembly, protect wires/seals and test service/disassembly.DFM-05 · Answer / status / evidence / owner / next action / review
  6. Can material or supplier substitutions change performance?Material/grade, flame/contact/corrosion requirements, finishes, standard hardware and qualified equivalents. Preserve designer catalog references separately from purchasing sources.DFM-06 · Answer / status / evidence / owner / next action / review
  7. Are the files complete and at one revision?Bill of materials, STEP solid and dimensioned drawings where applicable, materials/finishes, critical characteristics, assembly notes, quantity breaks and inspection/acceptance requirements. A render is not a release package.DFM-07 · Answer / status / evidence / owner / next action / review
  8. What did the manufacturer flag, and who accepted changes?Dated supplier DFM feedback, disposition, affected requirements, cost/tooling impact, owner and verification/retest. Obtain review before releasing revised work.DFM-08 · Answer / status / evidence / owner / next action / review

Source guidance: Protolabs — Process-specific design tips · NIST MEP — Product design and development · CPSC — Small business product-safety resources · Protolabs — Uniform wall thickness in molded parts

The prototype role / the engineering role, the design role

What the prototype needs to prove

When: Before each prototype build and before reporting a result.

Keep: A test plan, build record and evidence-based test report.

Save in: product/prototypes/ and product/testing/

  1. Which question is this prototype answering?Appearance, usability, fit, mechanism, strength, life, process or customer acceptance; list what it cannot demonstrate.PROTOTYPE-01 · Answer / status / evidence / owner / next action / review
  2. What is the exact configuration?Model/drawing/BOM revision, materials, deviations from production, build method and sample identifiers.PROTOTYPE-02 · Answer / status / evidence / owner / next action / review
  3. How will we judge success before testing?Requirement ID, method, numerical/observable acceptance criterion, environment, equipment, calibration where needed and planned sample size rationale.PROTOTYPE-03 · Answer / status / evidence / owner / next action / review
  4. Is the test safe and representative?Foreseeable hazards, setup limits, operator competence, exposure safeguards, realistic users/conditions and specialist or lab involvement where needed.PROTOTYPE-04 · Answer / status / evidence / owner / next action / review
  5. What happened, including failures?Raw measurements, units, photos, observations, anomalies and deviation from method. Separate measured from simulated and predicted performance.PROTOTYPE-05 · Answer / status / evidence / owner / next action / review
  6. What can we conclude, and what remains unproven?Verification: meets specified requirements. Validation: serves intended users/use. State sample and prototype limits, owner of failures, required changes and retest before a release claim.PROTOTYPE-06 · Answer / status / evidence / owner / next action / review

Source guidance: NASA — Requirements verification matrix · CPSC — Small business product-safety resources · NASA — Product realization, verification and validation

Plan early: How to lay out the test plan, select prototypes and plan electrical/RF, drop and submersion tests. Includes plan, matrix and report templates.

The project manager / the engineering role, the prototype role, the funding role

Suppliers and production readiness

When: Before comparing quotes, placing production orders or scaling.

Keep: Comparable quotes, supplier evaluation and a production-readiness review.

Save in: business/suppliers/ and product/manufacturing/

  1. Are all suppliers quoting the same thing?Exact revision/material/finish/quantities, inspection, packaging and acceptance requirements; assumptions and exclusions alongside each quote.PRODUCTION-01 · Answer / status / evidence / owner / next action / review
  2. Can the supplier actually make and inspect it?Relevant capabilities, process limits, capacity, sample evidence, documented process scope, references, subcontractors and production location. Directory membership alone is not qualification.PRODUCTION-02 · Answer / status / evidence / owner / next action / review
  3. What are the real costs and commitments?Unit prices at realistic volumes, tooling/NRE, MOQ, lead times, payment/deposit terms, currency, freight/trade terms, duties, scrap, quote expiry and cancellation/change terms.PRODUCTION-03 · Answer / status / evidence / owner / next action / review
  4. Who owns tooling, data and changes?Tool ownership, custody, maintenance and transfer access; drawings and IP, approved substitutions and who can authorize changes.PRODUCTION-04 · Answer / status / evidence / owner / next action / review
  5. How will we accept incoming parts and production output?First-article/pilot evidence, critical characteristics, sampling rationale, measurement methods, traceability, nonconformance/rework and corrective actions.PRODUCTION-05 · Answer / status / evidence / owner / next action / review
  6. Can we deliver and recover from interruption?Pilot quantity, ramp/capacity plan, long-lead parts, approved alternate sources, packaging/shipping trials, inventory and reorder points.PRODUCTION-06 · Answer / status / evidence / owner / next action / review
  7. What must be in place after sale?Warranty, spare parts, service, complaints, traceability and recall/incident process appropriate to product/market.PRODUCTION-07 · Answer / status / evidence / owner / next action / review
  8. Is the first production order ready?Close or explicitly disposition DFM/test gaps, confirm current file package and cash need with the funding role. Record the person’s release decision; never infer authorization to place an order.PRODUCTION-08 · Answer / status / evidence / owner / next action / review

Source guidance: NIST MEP — Supplier scouting inquiry fields · CPSC — Small business product-safety resources

The funding role / the project manager, the legal role, the marketing role

Prepare for funding and finance conversations

When: When a defined milestone needs outside money; tailor to the actual lender, investor or program.

Keep: A dated funding brief with linked evidence, financial model and recipient-specific document list.

Save in: business/funding/; supporting numbers in business/finance/

SBA does not provide general grants to start or expand an ordinary business. A research program or other grant requires a currently open, eligible solicitation.

Friends-and-family funding is not automatically exempt from securities rules. The legal role helps identify the legal route before an investment offer is shared.

  1. How much money is needed, for what milestone and by when?Use-of-funds line items, founder contribution, quotes/estimates, runway, contingency and measurable milestone. Separate startup spending, inventory and operating costs.FUNDING-01 · Answer / status / evidence / owner / next action / review
  2. Which funding route fits the business?Self-funding/revenue, loan, equity, eligible grant, licensing or rewards crowdfunding. Compare repayment, dilution/control, eligibility, restrictions, timing and ability to deliver.FUNDING-02 · Answer / status / evidence / owner / next action / review
  3. What evidence supports the commercial story?Problem, customer, product/demo, alternatives/competition, market assumptions, business model, channel economics, traction and team/gaps. Do not count interest as sales.FUNDING-03 · Answer / status / evidence / owner / next action / review
  4. Are the financials coherent?Actual financial statements if available; forecast income, balance sheet and monthly cash flow; unit economics, break-even, low/base/high scenarios, working capital and debt service where relevant. Clearly label pre-revenue estimates.FUNDING-04 · Answer / status / evidence / owner / next action / review
  5. What will a lender need?Recipient’s current checklist: business plan, purpose/amount, historical tax/financial records where applicable, forecasts, repayment source, ownership, relevant collateral/guarantee questions and contracts. Request sensitive records securely, not in public materials.FUNDING-05 · Answer / status / evidence / owner / next action / review
  6. What will an investor need?Investor fit by stage/sector; concise pitch, funding ask and milestone, market/traction evidence, cap table, team, entity/IP ownership records, contracts and financial model. Explain how investors might receive a return; review dilution and control with advisers. Organize controlled diligence access and unresolved issues.FUNDING-06 · Answer / status / evidence / owner / next action / review
  7. What will a grant or crowdfunding route need?For a grant: current open solicitation, fit, eligibility, registrations, work plan, deliverables, budget/allowable costs and deadlines. For rewards: prototype, production/fulfillment budget, delivery assumptions and rewards. Securities crowdfunding is a different regulated route.FUNDING-07 · Answer / status / evidence / owner / next action / review
  8. Is this ready to share with this recipient?Current requested format/documents, consistent numbers and revisions, public-disclosure implications, unanswered questions, proposed next step and human authorization. No guarantee of funding or invented valuation/terms.FUNDING-08 · Answer / status / evidence / owner / next action / review

Source guidance: SBA — Business planning and market research · SBA — Lender Match preparation · SEC — Ready to raise capital · Grants.gov — Search federal funding opportunities · Kickstarter — Creator Handbook · SEC — Early-stage investors · SBA — Grants and limited funding opportunities · Sequoia — Writing a business plan

The marketing role / the project manager, the legal role, the funding role

Customer evidence, marketing and launch

When: While testing demand and before a campaign or launch commitment.

Keep: A channel-specific launch plan, evidence-backed messaging and readiness decision.

Save in: business/marketing/

  1. Who is the first customer and why will they switch?Narrow segment, use case, alternatives, differentiated benefit and evidence from interviews/tests.LAUNCH-01 · Answer / status / evidence / owner / next action / review
  2. Which offer and price have we tested?Actual experiment, audience, price, offer, budget, duration and success measure. Separate paid conversion and repeat use from views/likes or expressions of interest.LAUNCH-02 · Answer / status / evidence / owner / next action / review
  3. What claims can we support?Claim-to-evidence list, demonstrations, endorsements/disclosures, product photos and instructions; the legal role reviews disclosure/IP concerns before publishing.LAUNCH-03 · Answer / status / evidence / owner / next action / review
  4. Which channel fits customer and economics?Direct web sales, marketplace, retail wholesale, distributors, licensing or combinations; buyer behavior, net receipts, acquisition cost, fulfillment and cash implications.LAUNCH-04 · Answer / status / evidence / owner / next action / review
  5. Are launch materials and operations ready?Product identifiers, packaging/dimensions, listing/sell sheet, images, substantiated copy, instructions, support, inventory, shipping/returns and applicable safety documentation.LAUNCH-05 · Answer / status / evidence / owner / next action / review
  6. What does a small launch have to prove?Pilot quantity/budget, target conversion, contribution, returns, reviews/complaints, stock availability, stop/adjust criteria and a scheduled review owner.LAUNCH-06 · Answer / status / evidence / owner / next action / review
  7. Who does what after launch?Customer support, returns/warranty, replenishment, marketing measurement, complaint escalation and decision to scale. Date the plan; confirm permissions before publishing.LAUNCH-07 · Answer / status / evidence / owner / next action / review

Source guidance: FTC — Advertising and marketing guidance · SBA — Business planning and market research · GS1 US — Product identifiers and barcodes

The marketing role / the funding role, the project manager, the legal role

Amazon, Walmart and Lowe’s: getting ready for buyers

When: After choosing a realistic channel and before applying, pitching or accepting terms.

Keep: A buyer-ready sell sheet, channel economics and route-specific application checklist.

Save in: business/marketing/; costs in business/finance/

  1. Which route are we seeking?Record marketplace seller, retailer wholesale supplier, private-brand supplier or distributor route. Marketplace approval does not mean store placement, and an application is not a purchase order.RETAIL-01 · Answer / status / evidence / owner / next action / review
  2. Does the product fit this retailer’s customers and assortment?Comparable listings/shelf alternatives, differentiation, target retail price, evidence of demand, packaging and current assortment gap hypothesis.RETAIL-02 · Answer / status / evidence / owner / next action / review
  3. Can we give a buyer a concise commercial packet?Sell sheet with use/benefit, photos/demo, dimensions, identifiers, target retail and wholesale prices, retailer margin assumption, MOQ/case pack, lead time, capacity, origin, test/compliance evidence and contact. Samples must match the stated revision.RETAIL-03 · Answer / status / evidence / owner / next action / review
  4. Will each sale and payment schedule work for us?Get actual category fees, freight, fulfillment, allowances/promotions, broker commission, returns, damage, deductions/chargebacks, payment terms and inventory commitments. Model cash needed before payment; do not treat typical margins as an offer.RETAIL-04 · Answer / status / evidence / owner / next action / review
  5. Can we meet operations and compliance requirements?Verify current insurance, product safety/testing/labeling, GTIN/UPC or exemptions, package/case data, EDI/ASN if required, fulfillment/service metrics, returns and recall readiness with the retailer. These are categories to confirm, not universal terms.RETAIL-05 · Answer / status / evidence / owner / next action / review
  6. Would a representative or distributor help?A sales rep/broker typically helps sell for a fee or commission; a distributor may buy/resell and handle inventory. Verify category/account relationships and references. Negotiate territory, exclusivity, services, compensation trigger, expenses, stock/title risk, termination and conflicts. A claimed connection is not guaranteed shelf space.RETAIL-06 · Answer / status / evidence / owner / next action / review
  7. What is the smallest credible entry?Direct application, limited online/pilot assortment, regional opportunity, appropriate supplier event or an established channel partner. Start with the retailer’s official route; a solo founder can apply but still must meet capability and qualification requirements.RETAIL-07 · Answer / status / evidence / owner / next action / review
  8. What is still required before submission or commitment?Save current portal requirements/date, application status, buyer feedback, open terms and exact package revision. The person authorizes submissions and agreements. Never imply that a submitted profile, listing or verbal interest equals acceptance.RETAIL-08 · Answer / status / evidence / owner / next action / review

Amazon: third-party selling

Start with Seller Central registration, separate from wholesale Vendor Central. Prepare identity/business and bank verification, category/product approvals, identifiers or an allowed exemption, brand rights and listing materials. Choose merchant fulfillment or FBA using the actual packaged size/weight and current fee calculator. Recheck selling-plan, referral, fulfillment, storage and returns costs; Brand Registry is a separate eligible-brand program.

Amazon — Seller registration guide · Amazon — Selling fees and calculator

Walmart: marketplace or retail supplier

Marketplace is third-party online selling. Published qualifications include business verification (SSN is not accepted as the business identifier), prior eCommerce success, suitable identifiers/catalog and WFS or U.S. warehouse fulfillment with returns capability. Confirm current exceptions and new-seller payment holds. Store/wholesale supply uses the separate supplier application, requirements and official checklist. Open Call is another possible route for eligible U.S.-made, grown or assembled products when an application window is open. None guarantees shelf space.

Walmart — Marketplace qualifications · Walmart — Marketplace registration and payments · Walmart — Apply to be a supplier · Walmart — Supplier checklist · Walmart — Supplier opportunities and Open Call

Lowe’s: branded, private-brand or marketplace

The official supplier page directs branded retail proposals to RangeMe and private-brand sourcing to PROVIS. Lowe’s Marketplace is a separate curated third-party route; check home-improvement category fit, U.S. inventory/shipping and product-data requirements. Obtain actual commissions, payment/return terms and service rules during onboarding. Some vendor-only or forthcoming documents were unavailable in this public review; leave those terms unverified.

Lowe’s — Branded and private-brand supplier routes · Lowe’s — Marketplace application and FAQs · Lowe’s — Marketplace seller documentation

Source guidance: Amazon — Seller registration guide · Amazon — Selling fees and calculator · Walmart — Apply to be a supplier · Walmart — Marketplace qualifications · Lowe’s — Branded and private-brand supplier routes · Lowe’s — Marketplace application and FAQs · GS1 US — Product identifiers and barcodes · Walmart — Supplier requirements · Walmart — Supplier checklist · Walmart — Marketplace registration and payments · Walmart — Supplier opportunities and Open Call · Lowe’s — Marketplace seller documentation · Trade.gov — Evaluating representatives

Sources and limits

The questions are original A.N. Creation templates informed by these sources. Public guidance was reviewed; account-specific contracts, private vendor portals and paid standards were not reviewed. Recheck changing rules, fees, program openings and recipient requirements when used.

Back to Resources

The check-sheet method is also in the hotbotspot tool library.

Everything here is a starting point. Work with artificial intelligence always needs tuning, so test it and dial it in for your own work, data and model before you rely on it.